Return to the previous level

Foton & Qingte Group Indonesia Joint Venture

2026-04-14

Location: North Maluku Province, Indonesia
Recommended Inspection Item: New energy truck assembly line (Indonesia)
Annual Capacity: Standard design capacity of 1,000 units per year per line (single shift); production takt time of 0.5 JPH (Jobs Per Hour)
Project Timeline: Mass production capability to be achieved in May 2026

Previous: